UBG and Gajurmukhi Nirman Company J.V.
Software Industry
kathmandu
Joint Venture of UBG-GNC has been contracted by United States Agency for International Development (USAID) Nepal to perform the reconstruction of three secondary schools in Kathmandu Valley, Nepal. ... Helvetica Neue", Arial, "Noto Sans", sans-serif;">The project work includes: demolition of existing buildings; construction of new single and multi-storied buildings; retrofitting of old buildings; and external site work that includes walkways, fence walls, underground utility system, installation of underground power cables, installation of street lightings, installation of electrical panels and construction of water tanks with waste water system etc. The locations of each school to be constructed are mentioned below. 1. Reconstruction of Kanya Mandir Secondary School, Nyokha, Kathmandu, 2. Reconstruction of Shree Bhagawati Secondary School, Sankhu (Sankharapur), Kathmandu, 3. Reconstruction of Adarsha Secondary School, Sanothimi, Bhaktapur
Company Expired Vacancies
Closed
Quality Control Manager
- Quality Control
- Kathmandu
- 3315
- Full Time
Having degree of Civil engineering from reputable universities Minimum 10 years of experience in building construction projects Working knowledge of English and fluency in Nepali Must have both office and site experience Experience with USAID o... Read more
Edu: Exp: 10 Year Position: Senior Level
Closed
Site Superintendent
- Construction
- Kathmandu
- 2655
- Full Time