Urja Developers Pvt. Ltd. (Urja)

Urja Developers Pvt. Ltd. (Urja)

Hydropower

Myagdi, Taplejung

Urja Developers Pvt. Ltd. (Urja), is the rising brand in the Nepal power sector. Incorporated in June 2016 A.D under the Company Act of Nepal, Urja has been able to establish a portfolio of hydropower projects with the cumulative installed capacity over 355 MW. These projects are in various phases of development: some are in study phase, some in construction stages. Urja envisions to harness 1 GW (1000 MW) hydropower potential in the count ... ry by 2030 AD; coherent with the plan and policy of Government of Nepal. Sustainable development of immense hydropower potential in the country is seen as the engine for Nepal's economic prosperity. This is possible through serving rising electricity demand in the domestic market and by securing key role in ensuring appropriate generation mix towards regional energy security in South Asia. Urja has core competence which aims to provide sustainable solutions through innovation and value engineering to the whole gamut of issues with lucid understanding of the life cycle of the hydropower development, while addressing social management and environmental challenges in a complex project implementation milieu. Urja's core competency include the resource and technical capability, institutional setup and competent human resources to provide complete integrated solutions for implementation of hydropower projects at the shortest possible time while maintaining highest quality standards at most competitive price. Such competence takes off from the identification of a potential hydropower site to operation and generation optimization of the well-built facilities. Urja has the core team of professionals who have extensive knowledge and experience in the hydropower development and are among few best hydro-professionals available in Nepal. Urja maintains the best working relations with the government agencies and Nepal Electricity Authority. It also has best relations with the best consulting firms, and the top-notch hydro professional in the country as well with the international firms for outsourcing the works of large volume. The Company has, under its umbrella, Hydropower projects in different phases of development, viz. a.     Mai Beni Hydropower Project, Ilam b.     Lower Jogmai Khola Hydropower Project, Ilam c.      Middle Mewa Hydropower Project, Taplejung d.     Palun Khola Hydropower Project, Taplejung e.     Dudhkoshi – 9 Hydropower Project, Solukhumbu f.       Tamakoshi – 9 Hydropower Project, Dolakha g.      Upper Myagdi-I Hydropower Project, Myagdi

View Company Profile

Senior Geologist

Apply Before : 2020-07-08 (Closed) View: 3840

Job summary

  • No. of Vacancy
    : 1
  • Job Type
    : Full Time
  • Offered Salary
    : Negotiable
  • Gender
    : Both
  • Career Level
    : Senior Level
  • Experience
    : 10 Years
  • Apply Before
    : 2020-07-08 Closed

Job Description:

Geologist shall be responsible for conducting geological and geotechnical field surveys and investigations, analyzing geological, geotechnical information, maps, tests reports and surveys. S/he will be responsible for providing input to design and stability analysis of surface and sub-surface works mainly tunnels and underground caverns. S/he shall also supervise and monitor underground construction activities at project sites.

Required Knowledge, Skills, and Abilities:

  • Willing to work at the Hydropower project site on full time basis
  • Proficiency in relevant software like AutoCAD, GIS

Education + Experience:

  • Masters Degree in Geology or Geotechnical Engineering
  • At least 10 years' experience, in Hydropower design, project construction and supervision.

Apply Instruction:

Interested candidates should email updated CV with a cover letter to info@urjadeveloper.com stating the position applied for. Only shortlisted applicants will be contacted for the further selection process.

Job Action